HomeAbout UsPanel SystemsHome PlansGreen BuildingTestimonialsFAQMap/DirectionsContact Us
 
 
arbor.jpg







Proper planning prior to the construction phase of a project ensures high-quality results. During the planning phase, we: 

  • Establish detailed construction schedule highlighting all activities including purchasing, fabrication, shop drawing production and construction work in place.
  • Order and expedite the delivery of all material.
  • Implement management control of all project activities.
  • Prepare and implement subcontract agreements and purchase orders.

Our Fabrication Facility

Arbor Park Homes are constructed in a modern fabricating facility located in Illinois--one of perhaps the largest in the Central United States. A dedicated staff of nearly one hundred skilled craftsmen can produce and ship up to seven complete homes a day. There are also additional offices for engineering and administrative.

tudorpanelized.jpg

TUDOR

“After dry-in, which took 11 days for the 2,500 sq. ft. superstructure, the project proceeded very smoothly. The homeowners happily completed their dream home with $19,000 equity.”

westbrookpanelized.jpg

CHARLES WESTBROOK

This 2,548 sq. ft. (living space w/ garage) home was “totally erected” in 24.75 hours by an 8- man crew of experienced and inexperienced personnel. The owners moved in 73 days after the arrival of the second container.

 

           Why panelized or system building...

Why Panelized Building/System Engineered Building Reduces Costs,
Saves Time and Delivers More Quality.

Successful entrepreneurs and educators who train those seeking business opportunities are well aware that in most cases, to sell a product, you sell the process and the results – like our extraordinary savings on a completed home.

But, our product, panelized house packages, have significant advantages for the buyer.

It is important to remember that the savings do not result from the panelized house package but from the owner/builder process defined by Arbor Park. 

tudor.jpg

In the past 25 years component building--also called system engineered building--has begun to dominate the building industry with over 50% of all homes constructed throughout the United States utilizing some component built systems. Panelization has been a business opportunity for savvy builders for decades.

Pre-building wall panels in a controlled environment is a natural evolution in the building industry resulting from the dominant use of roof truss systems in homes for many decades.

The wall panels can be constructed with a variety of window styles installed, a finished or unfinished siding, with rigid insulation and other options.

Panelization is widely accepted, considered to be a site built home, well engineered and easier to construct than older building techniques.

cwestbrook.jpg

The benefits are numerous; a faster, simpler erection process that saves time and money.

With Arbor Park the quality of material utilized is far superior to traditional “stick framing” and since price is a pre-determined quantity, lenders and buyers recognize the importance of eliminating the dangerous cost variables in labor and material which can result from the “traditional stick framing” process.

Country French Front View
CountryFrenchfinishedrearview.gif
CountryFrenchfinishedrearview.gif
Country French Rear View


 

InteriorDining.jpg
InteriorDining.jpg
InteriorDining.jpg